Kitchen Remodeling Services

Kitchen Remodeling Services


What you imagine, we create.


We are a full-service company with a design-build approach, so you will only have to work with one contractor. We are experts in all aspects of kitchen designs and kitchen remodeling services. We take great pride in our creativity, collaborative approach, and craftsmanship.


We can handle your dated kitchen like a craftsman:


 -demo

 -design & layout

 -fine cabinetry and stylish countertops & backsplashes

 -that statement piece island

 -practical storage

 -plumbing solutions, flooring, lighting to showcase your dream kitchen

 -top of the line appliances for the resident chef


Big or small, quality and communication is what has elevated us to the premier kitchen remodeler in Bridgeport, CT.


Other Kitchen Remodeling Services

The details matter.


Thoughtful choices for lighting, accents, hardware, and other key features can really tie the kitchen together visually and help it function just the way you need it to.


We work with a wide variety of vendors in order to find the right products that will fit your vision and your style.


Give us a call and we can talk through your kitchen remodeling project!

Popular Questions / FAQs

Got a question? We’re here to help.


  • How much does a typical kitchen remodel cost?

    There are numerous variables such as the size of the kitchen, the extent of the remodel, the spectrum of basic to luxury, and the major appliances selected. According to Forbes, a kitchen remodeling project typically ranges between $12,000 and $60,000. This includes materials, fixtures, and labor. The average kitchen remodel costs $27,000. Another rule of thumb is to plan to spend between 5% and 15% of your home value on a kitchen renovation or remodel.

  • How long does a kitchen remodel project take?

    There are many variables, but here are some approximate ranges based on the scope and size of the project:


    • small-scale kitchen remodel – 4 to 8 weeks
    • medium-scale kitchen remodel – 8 to 10 weeks
    • large-scale kitchen remodel – 5 to 6 months
  • What costs the most in a kitchen remodel?

    According to the National Kitchen and Bath Association, the main expenses in a kitchen remodel project are listed below in order of highest to lowest price:


    • cabinets: 29%
    • labor: 17%
    • appliances: 14%
    • Countertops: 10%
    • walls, doors, and windows: 9%
    • floors: 7%
    • lighting: 5%
    • design: 4%
    • plumbing and fixtures: 4%
    • miscellaneous: 1%

    These are not precise percentages, but should give you a general guide for what to expect in the project.

  • How much should labor cost for a kitchen remodel?

    The labor cost for a complete kitchen remodel can vary, but 25% of the total cost of your remodel is a good guideline to follow. So for every $10,000 you plan to spend, account for aboout $2,500 in installation expenses.

  • What adds most value to a house?

    Top 8 home improvements that add the most value:


    • redo your kitchen
    • refinish or install hardwood flooring
    • upgrade your insulation
    • convert a basement or attic to a living area
    • buy new siding
    • get new roofing
    • replace your garage door
    • install new vinyl or wood windows
  • What comes first in a kitchen remodel?

    For a full remodel, the first actionable step is tearing out your old kitchen. Demolition involves removing old appliances, cabinetry, and fixtures so that you have space to rebuild. It may also involve removing walls or portions of walls.

  • What not to forget when remodeling a kitchen?

    10 mistakes to avoid during your kitchen renovation, according to interior designers:


    • forgetting your budget
    • not taking inventory of your kitchen
    • not layering lighting
    • not considering clearances
    • not planning out your storage
    • forgetting electrical elements
    • ignoring your home's bones
    • renovating alone
  • How can I pay for a kitchen remodel?

    • personal savings
    • Home Equity Line of Credit (HELOC)
    • personal loan
    • low interest credit card
    • Federal programs like HUD’s 203(K) Program
  • What is the hardest part of the kitchen remodel?

    One of the hardest parts of a kitchen remodel project is making sure all the cabinets are in the right place, so they blend in with the existing woodwork. This is especially important when you are doing a whole kitchen renovation so it is vital to keep your installation plan organized.

  • Do you put down flooring before cabinets?

    Installing flooring first is considered the smarter process, because having them run right under your cabinets and appliances means that the next time you decide to update your kitchen, you'll have the flexibility to change the footprint instead of being stuck with the current configuration.

A black and white drawing of a map with a pin on it.
Location
Bridgeport, CT 06604, United States of America
A black and white drawing of an envelope on a white background.
Email
sales@kitchenremodelingbridgeport.com

Communities Served

BRIDGEPORT | Ansonia | Beacon Falls | Bethany | Danbury | Darien | Derby | East Haven | Easton | Fairfield | Georgetown | Hamden | Milford | Monroe | New Canaan | New Haven | Newtown | North Haven | Norwalk | Orange | Oxford | Redding | Ridgefield | Seymour | Shelton | Southbury | Southford | Stratford | Trumbull | West Haven | Weston | Westport | Wilton | Woodbridge

Yellow and black KRB logo
Kitchen Remodeling of Bridgeport is the leading kitchen remodeler servicing the Greater Bridgeport, CT area.

Working hours

Mon - Fri
-
Sat - Sun
Closed
Share by: